Java 9 & 10 Coal-Fired Power Plant
Banten, Indonesia
2024
The solution to the Java 9&10 PLTU Project is two Steam Power Plant (PLTU) units, which were newly developed as an expansion of the existing Suralaya PLTU and are located in Banten, Indonesia. Sika provides a special Non Shrink Grouting product for filling base plates in Boiler steel structures, Sikagrout 215 NEW as a base plate gap filler, with good flowability, strength, and is accepted by consultants.