2024
Banten, Indonesia
Sika is present as a solution for the Java 9&10 PLTU Project, namely two Steam Power Plant (PLTU) units, which were newly developed as an expansion of the existing Suralaya PLTU and is located in Banten, Indonesia.
Sika's solution for this project is to provide a special Non Shrink Grouting product for filling base plates on Boiler steel structures, Sikagrout 215 NEW as a base plate gap filler, with good flowability, strength, and is accepted by consultants.
For information, the 9 and 10 Ultra Super Critical 2x1,000 MW Steam Power Plant (PLTU) Project in Suralaya, Cilegon, Banten is claimed to be the only PLTU project that is environmentally friendly in its operation.
Project Details
Location: Banten, Indonesia
Construction/Application Years: 2020-2024
Capacity: 2 x 1000 MW
Project Requirements
Providing Non Shrink grouting products for steel structure boiler base plates
Sika Solutions
Providing special Non Shrink Grouting products for filling base plates on Boiler steel structures. Sikagrout® 215 New as a gap base plate filler, has good flowability, strength, and has been approved by the owner & consultant.
Products Used
Sikagrout® 215 new
Sikabit® W 15
Sikadur® 752
Sika MonoTop® 615 HB
Sika® Intraplast Z
Sikagrout® 280 HS
Sikabond® NV
Waterbar V25
Sika Antisol® S
Sika Separol® 10
Project Participants
Owner
PT. Indo Raya Daya
Consultant
Connusa Tepsco
Contractor
Doosan HK Consortium
Sub Contractor
PT. Construction Coins