2021
East Borneo, Indonesia
The Balang Island Bridge project in East Kalimantan is part of the government's major efforts to strengthen infrastructure in the Eastern Indonesia region, especially in supporting the development of the Indonesian National Capital City (IKN). This bridge connects Balikpapan City with North Penajam Paser Regency, passing through Balikpapan Bay.
With a length of 1,750 meters, the Balang Island Bridge was designed using
modern technology capable of dealing with local natural challenges, such as swamp conditions and strong winds.
Project Details
Location: East Borneo, Indonesia
Construction/Application Years: 2016-2021
The first Cable Stay Bridge connects from Balikpapan to Penajam
Paser Utara, with a total length of 1,750 meters.
Project Requirements
Delivery of materials on time, environmentally friendly, special concrete for drilled piles
Sika Solutions
Sika Concrete Solutions
Products Used
Sika Viscocrete® 8030 S
Sika® Plastiment VZ
Sika® Antisol E-125
Sika® Separol 10
Sikalatex®
Sikatop® 121
Sikadur® 31 CF Normal
Sikadur® 752
Sikagrout® 215 M
Sikatop® 144
Project Participants
Owner
PT, Satya Parahyangan Resort
Contractor
PT. Nusa Raya Cipta
Applicator
Asia Asindo