2021
South Borneo, Indonesia
Sika Solutions was present and contributed to the construction of the Alalak Bridge in Banjarmasin, South Kalimantan.
This bridge is not just a physical structure, but also the main access route for Banjarmasin City with various areas in South and Central Kalimantan. The vital function of the Sei Alalak Bridge is not only to facilitate the flow of transportation between regions, but also to provide efficiency in logistics costs.
Through the Sika products entrusted with the construction of this bridge, the people of Banjarmasin also hope that this bridge can support strengthening inter-regional connectivity, encourage economic growth, and create new economic centers around this region. Our spirit of collaboration and innovation continues flow
Project Details
Location: South Kalimantan, Indonesia
Year of Construction/Application: 2019-2021
The first curved concrete structure cable bridge in Indonesia, with a total length of 850 meters and a width of 20 meters.
Project Requirements
Delivery of materials on time, environmentally friendly, special concrete for drilled piles
Sika Solutions
Sika Bond Breaker
Products Used
Sika® ViscoFlow® 3660
Sika® ViscoCrete® 1050 HE
Sika® Plastiment® P121R
Project Participants
Owner
Ministry of PUPR
Consultant/Architect/Engineer
PT. Adhya Widya Services
Contractor
PT. Wijaya Karya
PT. Panji KSO